 |
|
The graphic below depicts the Quality Assurance Cycle, which involves the pre-analytic, analytic, and post-analytic phases of laboratory testing. Consistent and reliable practices in each of these phases is imperative to assure the accuracy of laboratory testing results.
|
|
This page last reviewed: 11/20/2006
|