Skip directly to site content Skip directly to page options

Variances by Cruise Ships
 
Variances by: Section
Cruise Ship:   Amadea 
Cruise Line:   Bernhard Schulte Cruise Services GmbH & Co. KG 
 
VSP Operations Manual Section:  5.3.2.1.1


Manual Requirement: Ensure potable water tanks do not share a common wall with the hull of the vessel or with tanks or piping containing nonpotable water or other liquids.

Request: Operate with potable water tanks that share a wall with the vessel hull based on the use of salinity sensors, alarms, a monitoring plan and a contingency plan if leaks are detected.

Status:  Approved

Summary:Operate with potable water tanks that share a wall with the vessel hull based on the use of salinity sensors, alarms, a monitoring plan and a contingency plan if leaks are detected.
 
Vessel Sanitation Program