Modify Selection
- Hazard prevention and control:
- Administrative controls
- or
- Hazardous materials management
- or
- Emergency planning
- or
- Preparedness checklists
- or
- Work design
- or
- Acclimatization
- or
- Safety culture
- or
- Safety incentives
- or
- Employee management
- or
- Worker participation
- or
- Hazard recording
- or
- Health and safety programs
- or
- Hearing conservation programs
- or
- Materials storage
- or
- Policies
- or
- Standards
- or
- Work scheduling
- or
- Work pace control
- or
- Work breaks
- or
- Task rotation
- or
- Communications
- or
- Emergency communications
- or
- Signalling
- or
- Hand signalling
Home Links
Results 41 - 50 of 235
-
5/9/2019 - Research projectsA project to minimize the risk of heat illness for miners entering an RA, ensure the availability of air delivery and purging systems for RAs, facilitate the use of BIP RAs, and develop a reliable communications system for RAs.
-
5/9/2019 - Training materialsSection 6 of the OMSHR advanced tutorial on wireless commumnication and electronic tracking covering the mine operations center.
-
5/9/2019 - Training materialsSection 3 of the OMSHR advanced tutorial on wireless communication and electronic tracking covering electronic tracking systems performance.
-
5/9/2019 - Training materialsSection 4 of the OMSHR advanced tutorial on wireless communication and tracking covering CT system survivability, reliability and availability.
-
5/9/2019 - Training materialsSection 5 of the OMSHR advanced tutorial on wireless commnication and elctronic tracking covering CT system safety.
-
5/9/2019 - Training materialsSection 2 of the OMSHR advanced tutorial on wireless communication and electronic tracking covering communication system performance.
-
5/9/2019 - Training materialsAppendix B of the OMSHR advanced tutorial on wireless communication and electronic tracking covering basic equations.
-
4/2/2019 - Research projectsA project to define workplace fatigue for the mining industry by developing a preliminary fatigue model and management system using a human factors systems approach, which accounts for the predictors causing fatigue.
-
3/1/2019 - Peer reviewed journal articlesAn article that aims to concisely review what is and is not known about worker fatigue in mining.
-
12/3/2018 - Peer reviewed journal articlesAn article demonstrating that international equipment evaluation standards for electrical/electronic equipment will provide at least the same level of protection for miners as the MSHA requirements.
Home Links
Content source: National Institute for Occupational Safety and Health, Mining Program