- Mine locations, excavations, and structures:
- Recovery rooms
Home Links
Results 1 - 5 of 5
-
3/1/2008 - Conference papersSome surprising results were revealed in this study designed and implemented by NIOSH to evaluate the effectiveness of pre-driven longwall recovery rooms supported with pumpable concrete roof supports.
-
7/1/2007 - Conference papersA unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. The complete transformation took place in less than 12 hours.
-
7/1/2007 - Conference papersA cooperative study was conducted to evaluate the effectiveness of (partially) pre-driven longwall recovery rooms supported with pumpable roof supports.
-
2/1/2004 - Conference papersA calibrated three-dimensional finite element model, developed in conjunction with an underground test area, provided the critical components and design principals for a comprehensive parametric study.
-
1/1/1998 - Conference papersUnusual circumstances sometimes require a longwall retreat into/through a previously driven room, with the potential for failures and roof fall hazards. To determine the failure factors, NIOSH compiled an international database of 130 case histories.